Nortel Communication Server 1000
Nortel Communication Server 1000 Release 5.5
Communication Server 1000M and
Meridian 1
Large System Installation and Commissioning
Document Number: NN43021-310
Document Release: Standard 02.01
Date: December 2007
Year Publish FCC TM
Copyright © 2007, Nortel Networks. All rights reserved.
Sourced in Canada
LEGAL NOTICE While the information in this document is believed to be accurate and reliable, except as
otherwise expressly agreed to in writing. NORTEL PROVIDES THIS DOCUMENT "AS IS" WITHOUT
WARRANTY OR CONDITION OF ANY KIND, EITHER EXPRESS OR IMPLIED. The information and/or
products described in this document are subject to change without notice.
Nortel, Nortel (Logo), the Globemark, SL-1, Meridian 1, and Succession are trademarks of Nortel Networks. All
other trademarks are the property of their respective owners.
Title page
Seitenansicht 0
1 2 3 4 5 6 ... 457 458

Inhaltsverzeichnis

Seite 1 - Meridian 1

Nortel Communication Server 1000Nortel Communication Server 1000 Release 5.5Communication Server 1000M and Meridian 1Large System Installation and Com

Seite 2

Page 10 of 456 ContentsNN43021-310 Standard 02.01 December 2007

Seite 3

Page 100 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Large Candeo sample configurationsExample configuration #1• 1.05 m (42 in.

Seite 4 - Page 4 of 456 Contents

Installing DC power Page 101 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningSmall Candeo modulesThe Cand

Seite 5

Page 102 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007capacity of the supplementary shelf is 180 A (six rectifiers delivering 30

Seite 6

Installing DC power Page 103 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning• remote or local access (PS

Seite 7

Page 104 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Enclosure, an enclosed shelf for use in Candeo racks. Each battery shelf c

Seite 8 - Page 8 of 456 Contents

Installing DC power Page 105 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningExample configuration #2A 30

Seite 9 - Contents Page 9 of 456

Page 106 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Figure 36Small Candeo 300 A system with supplementary distribution panelIn

Seite 10 - Page 10 of 456 Contents

Installing DC power Page 107 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstallation Manual (P700028

Seite 11 - New in this release

Page 108 of 456 Installing DC powerNN43021-310 Standard 02.01 December 20073 Cabling and connecting — Basic rules, specifications for connecting lugs

Seite 12

Installing DC power Page 109 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning8 Abbreviations and Acronyms

Seite 13 - List of Procedures

Page 11 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning12New in this releaseFeaturesThere are no new featu

Seite 14

Page 110 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007To eliminate potential of system problems and ensure the best grounding me

Seite 15

Installing DC power Page 111 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningNote 1: In some equipment si

Seite 16

Page 112 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Note 1: The frame ground collector cable is normally sized according to it

Seite 17

Installing DC power Page 113 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 7Installing and co

Seite 18

Page 114 of 456 Installing DC powerNN43021-310 Standard 02.01 December 20072 Connect the other end of the cable to the FG collector with a parallel t

Seite 19 - How to get help

Installing DC power Page 115 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 38Connection of the f

Seite 20

Page 116 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Figure 39Ground and logic return distribution – Large and Small Candeo pow

Seite 21 - Finding the latest updates

Installing DC power Page 117 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFour-Feed PDUThe Four-Feed P

Seite 22

Page 118 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007The four breakers (one for each module) in the existing DC PDU (NT4N50AA)

Seite 23 - System information

Installing DC power Page 119 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 42PDU circuit protect

Seite 24 - Applicable systems

Page 12 of 456 New in this releaseNN43021-310 Standard 02.01 December 2007April 2006Standard 4.00. This document is up-issued with corrections from C

Seite 25 - Intended audience

Page 120 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007A maximum loop drop of 2 V is allowed between the pedestal, or junction bo

Seite 26 - NTP feedback

Installing DC power Page 121 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningThe following equipment is l

Seite 27 - Related information

Page 122 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007With the NT4N49AA PDU, the safety ground/protective earth wires and all wi

Seite 28

Installing DC power Page 123 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling the Four-Feed PDU

Seite 29

Page 124 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007next as illustrated in Figure 45, connecting all of the columns together (

Seite 30

Installing DC power Page 125 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnecting power from the po

Seite 31 - Introduction

Page 126 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007c. Connect the wires to the matching connections on the terminal block on

Seite 32 - Page 32 of 456 Introduction

Installing DC power Page 127 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning10 Replace the metal safety

Seite 33 - Summary of procedures

Page 128 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Figure 46PDU to Large Candeo connections End of Procedure553-AAA0760

Seite 34 - Page 34 of 456 Introduction

Installing DC power Page 129 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnecting UK power to the F

Seite 35

Page 13 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning18List of ProceduresProcedure 1Preparing the equipm

Seite 36 - Page 36 of 456 Introduction

Page 130 of 456 Installing DC powerNN43021-310 Standard 02.01 December 20074 Connect the black BATRTN (+48 V) wires.a. At the 8B/2R or 8B/4R master p

Seite 37 - Preparing for installation

Installing DC power Page 131 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 47UEM to 8B/2R or 8B/

Seite 38 - System equipment – UEMs

Page 132 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007

Seite 39 - Universal Equipment Modules

Page 133 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning144Planning and designating a Main Distribution Fr

Seite 40 - Columns are grouped in rows

Page 134 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007This chapter describes how to install and c

Seite 41 - Figure 2

Planning and designating a Main Distribution Frame Page 135 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commission

Seite 42 - Card cage

Page 136 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007Figure 49BIX moduleConnector Designation st

Seite 43

Planning and designating a Main Distribution Frame Page 137 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commission

Seite 44 - Figure 4

Page 138 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007Installing the Krone cross-connect system (

Seite 45 - System options

Planning and designating a Main Distribution Frame Page 139 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commission

Seite 46 - Core/Net 1

Page 14 of 456 NN43021-310 Standard 02.01 December 2007Procedure 13Installing a PFTU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Seite 47 - Four-tier multi-group system

Page 140 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007Figure 52CE/PE module card allocation – Kro

Seite 48 - Figure 8

Planning and designating a Main Distribution Frame Page 141 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commission

Seite 49

Page 142 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007Figure 54Label for Analog Tie Trunk CardFig

Seite 50 - Figure 9

Planning and designating a Main Distribution Frame Page 143 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commission

Seite 51

Page 144 of 456 Planning and designating a Main Distribution FrameNN43021-310 Standard 02.01 December 2007Figure 58Label for Exchange Line Trunk Card

Seite 52 - Signaling Server

Page 145 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning150Installing Power Failure Transfer UnitsContents

Seite 53 - 553-AAA0561

Page 146 of 456 Installing Power Failure Transfer UnitsNN43021-310 Standard 02.01 December 20075 Designated telephones (DTMF or rotary dial types) 6

Seite 54 - Cable routing guidelines

Installing Power Failure Transfer Units Page 147 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 6

Seite 55 - 553-3117

Page 148 of 456 Installing Power Failure Transfer UnitsNN43021-310 Standard 02.01 December 2007Installing a PFTUUse the following procedure and any i

Seite 56 - Figure 13

Installing Power Failure Transfer Units Page 149 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioningc. Conne

Seite 57

Page 15 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 29Connecting the Core module to a LAN

Seite 58 - Unloading equipment

Page 150 of 456 Installing Power Failure Transfer UnitsNN43021-310 Standard 02.01 December 20072 For each trunk assigned to the PFTU.• Connect the ti

Seite 59 - Handling circuit cards

Page 151 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning170Configuring the system monitor ContentsThis sec

Seite 60 - Static discharge points

Page 152 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Figure 62System monitor to system monitor serial link cablingPo

Seite 61

Configuring the system monitor Page 153 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConfiguring the S

Seite 62

Page 154 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007with CPU 1 as slave unit 1. Number the slaves sequentially wher

Seite 63 - Slide to

Configuring the system monitor Page 155 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning4 on on on off on

Seite 64 - Captive screw

Page 156 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Table 11SW2 on slaves—total unit number for the slaves (Part 1

Seite 65 - Overview

Configuring the system monitor Page 157 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningEnd of ProcedureC

Seite 66

Page 158 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Figure 63System monitor module-to-module cablingFollow the step

Seite 67 - Module positioning guides

Configuring the system monitor Page 159 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning3 Connect the mas

Seite 68

Page 16 of 456 NN43021-310 Standard 02.01 December 2007Procedure 45Cabling an IPE Module (NT8D37) or Media Gateway . . . . . . . . . . . 264Proced

Seite 69 - 553-5068

Page 160 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Figure 65Cabling CS 1000M SG or Meridian 1 PBX 61C, single colu

Seite 70

Configuring the system monitor Page 161 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 66Multiple

Seite 71

Page 162 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Note 1: The system monitor to MDF cable is available in three

Seite 72

Configuring the system monitor Page 163 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning7 For AC-powered

Seite 73

Page 164 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Figure 67UPS alarm cabling8 For DC-powered systems, extend the

Seite 74 - Screw Stand-off

Configuring the system monitor Page 165 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningAlarm interfacing

Seite 75 - 553-5067

Page 166 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007• remote access — by means of the web browser on a computer con

Seite 76

Configuring the system monitor Page 167 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning•Main AC fail• Re

Seite 77 - Installing AC power

Page 168 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007Cabling the Candeo There are eight configurable Candeo output p

Seite 78

Configuring the system monitor Page 169 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 17Confi

Seite 79 - Large System

Page 17 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 61Sysload test . . . . . . . . . . . .

Seite 80

Page 170 of 456 Configuring the system monitorNN43021-310 Standard 02.01 December 2007

Seite 81

Page 171 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning186Connecting a system terminal or modemContentsTh

Seite 82

Page 172 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 2007Figure 68Terminal connection diagramDuring the initial i

Seite 83 - Ground lugs

Connecting a system terminal or modem Page 173 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnecting

Seite 84 - 553-8996

Page 174 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 2007Terminals connected to the COM1 ports can be installed a

Seite 85 - Installing UPS ground cabling

Connecting a system terminal or modem Page 175 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 69O

Seite 86

Page 176 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 20075 To communicate directly with a COM1 port, switch the c

Seite 87 - 553-3089

Connecting a system terminal or modem Page 177 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnecting

Seite 88

Page 178 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 2007Figure 71One terminal and a switch box to the SDI and CO

Seite 89

Connecting a system terminal or modem Page 179 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningYou can co

Seite 90

Page 18 of 456 NN43021-310 Standard 02.01 December 2007Procedure 77Connecting an HP DL320-G4 Signaling Server . . . . . . . . . . . . . . . . 398Pr

Seite 91 - Customer-provided

Page 180 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 2007Configuring a modemUse Procedure 21 to configure the mod

Seite 92

Connecting a system terminal or modem Page 181 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning6 Disconne

Seite 93 - Installing DC power

Page 182 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 20073 At the local end, configure the modem.Follow the manuf

Seite 94 - Candeo DC power systems

Connecting a system terminal or modem Page 183 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 72M

Seite 95

Page 184 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 20073 At the local end, configure the modem.Follow the manuf

Seite 96

Connecting a system terminal or modem Page 185 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 73M

Seite 97 - Large Candeo modules

Page 186 of 456 Connecting a system terminal or modemNN43021-310 Standard 02.01 December 2007Figure 74Modem to a switch box and SDI and COM2 ports (s

Seite 98

Page 187 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning206Cabling Common Equipment in aSingle Group syste

Seite 99

Page 188 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007the secondary shrouds, which provide mechani

Seite 100

Cabling Common Equipment in a Single Group system Page 189 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 101 - Small Candeo modules

Page 19 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning20How to get helpThis section explains how to get h

Seite 102

Page 190 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Reviewing Core/Net module placementCore/Net

Seite 103

Cabling Common Equipment in a Single Group system Page 191 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 104 - Figure 35

Page 192 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Reviewing required Core cardsAll Core cards

Seite 105

Cabling Common Equipment in a Single Group system Page 193 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 106 - Installation reference guide

Page 194 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Figure 78Core/Net cable connections (top vie

Seite 107

Cabling Common Equipment in a Single Group system Page 195 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 108 - Configuration reference guide

Page 196 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Procedure 24Installing the CP PIV to I/O pan

Seite 109

Cabling Common Equipment in a Single Group system Page 197 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 110

Page 198 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Figure 80CP PIV Core/Net Module slotConfigur

Seite 111 - (or safety ground) leads

Cabling Common Equipment in a Single Group system Page 199 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 113

Page 20 of 456 How to get helpNN43021-310 Standard 02.01 December 2007Outside North America, go to the following Web site to obtain the phone number

Seite 114 - 553-AAA1515

Page 200 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Procedure 26Connecting the 3PE faceplates in

Seite 115 - 553-AAA0759

Cabling Common Equipment in a Single Group system Page 201 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 116 - Figure 39

Page 202 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Connecting the Core/Net backplanesThe Shelf

Seite 117 - 553-AAA0467

Cabling Common Equipment in a Single Group system Page 203 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 118 - 553-AAA0468

Page 204 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Connecting Core modules to a LANConnect each

Seite 119 - PDU circuit protection

Cabling Common Equipment in a Single Group system Page 205 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioni

Seite 120

Page 206 of 456 Cabling Common Equipment in a Single Group systemNN43021-310 Standard 02.01 December 2007Figure 85Options for LAN 1 connectionsEnd of

Seite 121 - 553-8997

Page 207 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning238Cabling Common Equipment in aMulti Group system

Seite 122

Page 208 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007which faces the front of the module, contains

Seite 123 - Installing the Four-Feed PDU

Cabling Common Equipment in a Multi Group system Page 209 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 124 - 553-8995

Page 21 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning22Finding the latest updates on the Nortel web site

Seite 125

Page 210 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Reviewing Core/Net module placementCore/Net m

Seite 126

Cabling Common Equipment in a Multi Group system Page 211 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 127

Page 212 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Checking Core card (front side) installationA

Seite 128 - 553-AAA0760

Cabling Common Equipment in a Multi Group system Page 213 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 129

Page 214 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Procedure 31Disconnecting cable connectors fr

Seite 130 - System monitor connections

Cabling Common Equipment in a Multi Group system Page 215 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 131 - Each output is rated at 30 A

Page 216 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 88Core card placement in the NT4N41 Co

Seite 132

Cabling Common Equipment in a Multi Group system Page 217 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 133 - Main Distribution Frame

Page 218 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007 Customer supplied Standard CAT5 Ethernet cab

Seite 134 - Terminal block requirements

Cabling Common Equipment in a Multi Group system Page 219 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 135

Page 22 of 456 Finding the latest updates on the Nortel web siteNN43021-310 Standard 02.01 December 2007

Seite 136 - BIX module

Page 220 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 91CP PIV Core and Network backplanesIn

Seite 137 - Figure 50

Cabling Common Equipment in a Multi Group system Page 221 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 138

Page 222 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 92I/O panel connections End of Procedu

Seite 139 - 553-6459

Cabling Common Equipment in a Multi Group system Page 223 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 140 - 553-6460

Page 224 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 93Options for LAN 1 connectionsEnd of

Seite 141 - 553-6461

Cabling Common Equipment in a Multi Group system Page 225 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 142 - 553-6463

Page 226 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Required cardsTable 30 on page 226 outlines t

Seite 143 - 553-6465

Cabling Common Equipment in a Multi Group system Page 227 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 144 - EXCHANGE LINES

Page 228 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007FIJI card cablingFiber Network is enabled by

Seite 145 - PFTU configurations

Cabling Common Equipment in a Multi Group system Page 229 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 146 - Figure 60

Page 23 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning30System informationThis document is a global docum

Seite 147 - 553-7559

Page 230 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007The OCMC contains no electronic components an

Seite 148 - Installing a PFTU

Cabling Common Equipment in a Multi Group system Page 231 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 149

Page 232 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 97Shelf 0 fiber optic ring on a 4 grou

Seite 150 - Installing QUA6 PFTUs

Cabling Common Equipment in a Multi Group system Page 233 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 151 - System monitor cabling

Page 234 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007FIJI to FIJI cablingThe FIJI cards in Shelf 0

Seite 152 - DC power observation

Cabling Common Equipment in a Multi Group system Page 235 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 153

Page 236 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 100Clock Controller placementConnect t

Seite 154

Cabling Common Equipment in a Multi Group system Page 237 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissionin

Seite 155

Page 238 of 456 Cabling Common Equipment in a Multi Group systemNN43021-310 Standard 02.01 December 2007Figure 101Clock Controller cable configuratio

Seite 156

Page 239 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning260Cabling network modules and loopsContentsThis s

Seite 157 - Cabling the System Monitor

Page 24 of 456 System informationNN43021-310 Standard 02.01 December 2007For this document, the CP PIV processor is assumed in the case of the CS 100

Seite 158 - 553-7544

Page 240 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Network module connectionsEach multi-group system contains b

Seite 159 - 553-3112

Cabling network modules and loops Page 241 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 1023PE

Seite 160 - 553-3111

Page 242 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Figure 103Network Group 0: Shelf 0 to Shelf 1 backplane conn

Seite 161 - Slave unit n

Cabling network modules and loops Page 243 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningThis connectio

Seite 162

Page 244 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Figure 104Network Shelf 0 to Shelf 1 backplane connections (

Seite 163

Cabling network modules and loops Page 245 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnecting the

Seite 164 - Large System columns

Page 246 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Figure 106Core/Net backplane (rear view)GNDVCC+ 12GNDGNDVCCI

Seite 165 - Alarm interfacing to Candeo

Cabling network modules and loops Page 247 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 1073PE

Seite 166

Page 248 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007cCNI slot and port assignmentsEach system core shelf contain

Seite 167

Cabling network modules and loops Page 249 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningcCNI to 3PE Fa

Seite 168 - Configuring the alarm ports

System information Page 25 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning• Meridian 1 Option 51• Meridi

Seite 169 - Customizing alarms

Page 250 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Connecting the 3PE cables to the 3PE fanout panelsTwo NTND14

Seite 170

Cabling network modules and loops Page 251 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningRefer to Table

Seite 171 - About the system terminal

Page 252 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 20075 Install the remaining cables according to the assignments

Seite 172 - 553-A0131

Cabling network modules and loops Page 253 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning3 Cable networ

Seite 173 - Connecting a terminal

Page 254 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Table 33NT8D04 network loop configurationsFROM TOSuperloopne

Seite 174

Cabling network modules and loops Page 255 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 110NT8D

Seite 175 - COM1 and COM2 ports

Page 256 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Cabling a Superloop Network Card – multiple columnsIf the sy

Seite 176 - 553-A0134

Cabling network modules and loops Page 257 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning4 Cable networ

Seite 177 - SDI and COM1 ports

Page 258 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 20078 During system software configuration, use the Software Inp

Seite 178 - Connecting a modem

Cabling network modules and loops Page 259 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 112NT8D

Seite 179 - Modem guidelines

Page 26 of 456 System informationNN43021-310 Standard 02.01 December 2007understand the Communication Server 1000M and Meridian 1: Large System Overv

Seite 180 - Configuring a modem

Page 260 of 456 Cabling network modules and loopsNN43021-310 Standard 02.01 December 2007Figure 113NT8D04 Superloop Network Card network loops – cont

Seite 181 - (see Figure 72 on page 183)

Page 261 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning298Cabling lines and trunksContentsThis section co

Seite 182

Page 262 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Figure 114NT8D37 backplane cable designationsTable 34NT8D37 cable con

Seite 183 - Remote end

Cabling lines and trunks Page 263 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningMedia Gateway cabling r

Seite 184

Page 264 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Procedure 45Cabling an IPE Module (NT8D37) or Media Gateway1 Select a

Seite 185 - Figure 73

Cabling lines and trunks Page 265 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 115NT8D37 IPE Mo

Seite 186 - Figure 74

Page 266 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Connecting lines and trunksFollow Procedure 46 to connect lines and t

Seite 187 - Single Group system

Cabling lines and trunks Page 267 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 35Line and trunk

Seite 188

Page 268 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007 14T/14R 39/14 BK-BR/BK-BR 1315T/15R 40/15 BK-S/S-BK 1416T/16R 41/16

Seite 189 - Core/Net module

Cabling lines and trunks Page 269 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 37NT8D37 IPE Modu

Seite 190 - Figure 76

System information Page 27 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningRelated informationThis sectio

Seite 191 - Figure 77

Page 270 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 38NT8D37 IPE Module: NT8D15 E&M Trunk Card 2-wire paging mo

Seite 192 - Reviewing required Core cards

Cabling lines and trunks Page 271 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning3T/3RE/M38/1340/15BK-G/

Seite 193 - Cabling the Core side

Page 272 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007TA/ TBRA/RBE/MESC/ESCGTA/ TBRA/RBEA/EBMA/MB38/1339/1440/1541/16BK-G/G

Seite 194 - 553-9059

Cabling lines and trunks Page 273 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTA/ TBRA/RBE/MESC/ESCGT

Seite 195 - Cabling the I/O panel

Page 274 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 42NT5K17 Direct Dial Inward Trunk connections for NT8D37 I/O pa

Seite 196

Cabling lines and trunks Page 275 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningT6R63813BK-GG-BKSlot 0

Seite 197 - Cabling the Network side

Page 276 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007T3R3327R-OO-RSlot 1 Slot 5 Slot 9 Slot 13 Unit 3338R-GG-RT4R4349R-BRB

Seite 198 - PS 01234567891011

Cabling lines and trunks Page 277 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningT2R24621V-BLBL-VSlot 0

Seite 199

Page 278 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007T3R3327R-OO-RSlot 2 Slot 6 Slot 10 Slot 14 Unit 7338R-GG-RT4R4349R-BR

Seite 200

Cabling lines and trunks Page 279 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningT2R24621V-BLBL-VSlot 3

Seite 201 - NT8D80AZ cable

Page 28 of 456 System informationNN43021-310 Standard 02.01 December 2007• CS 1000M and Meridian 1 61C CP PII to CS 1000M MG CP PIV FNF Upgrade (NN43

Seite 202 - Core backplane

Page 280 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007T3R3327R-OO-RSlot 0 Slot 4 Slot 8 Slot 12 Unit 3338R-GG-RT4R4349R-BRB

Seite 203 - Sys Util

Cabling lines and trunks Page 281 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 46NT5K18 Flexible

Seite 204

Page 282 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007T7R74015BK-SS-BKSlot 1 Slot 5 Slot 9 Slot 13 Unit 74116Y- B LBL-YT0R0

Seite 205 - Core shelf (front of module)

Cabling lines and trunks Page 283 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 47NT5K18 Flexible

Seite 206 - Front of module

Page 284 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007T7R74015BK-SS-BKSlot 3 Slot 7 Slot 11 Slot 15 Unit 34116Y- B LBL-YT0R

Seite 207 - Multi Group system

Cabling lines and trunks Page 285 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 48NT5K19 Flexible

Seite 208

Page 286 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 49NT5K19 E&M 2-Wire Type 1 connections for NT8D37 I/O panel

Seite 209

Cabling lines and trunks Page 287 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 50NT5K19 Flexible

Seite 210

Page 288 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 51NT5K19 Flexible E&M 2-Wire Paging trunk connections for N

Seite 211 - Figure 87

Cabling lines and trunks Page 289 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 52NT5K19 Flexible

Seite 212

System information Page 29 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningOnlineTo access Nortel documen

Seite 213

Page 290 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 53NT5K19 Flexible E&M 2-Wire Paging trunk connections for N

Seite 214

Cabling lines and trunks Page 291 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 54NT5K19 Flexible

Seite 215

Page 292 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 55NT5K19 Flexible E&M 2-Wire Recorded Announcement trunk co

Seite 216 - Core shelf cabling

Cabling lines and trunks Page 293 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 56NT5K19 Flexible

Seite 217 - Required Core cables

Page 294 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 57NT5K19 Flexible E&M 4-Wire Type 1 connections for NT8D37

Seite 218

Cabling lines and trunks Page 295 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 58NT5K19 Flexible

Seite 219

Page 296 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007TATB4217Y- OO-YSlot 2 Slot 6 Slot 10 Slot 14 Unit 0RARB4318Y- GG-YEM4

Seite 220 - Figure 91

Cabling lines and trunks Page 297 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 59NT5K19 Flexible

Seite 221

Page 298 of 456 Cabling lines and trunksNN43021-310 Standard 02.01 December 2007Table 60NT5K19 Flexible E&M AC15 Trunk connections for NT8D37 I/O

Seite 222 - End of Procedure

Page 299 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning334Powering up the system and initial loadingConte

Seite 223

Page 3 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning10ContentsContents . . . . . . . . . . . . . . . . .

Seite 224 - Options for LAN 1 connections

Page 30 of 456 System informationNN43021-310 Standard 02.01 December 2007

Seite 225 - Dual Ring Fiber Network

Page 300 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007Procedure 47Installing the Security DeviceThe Secur

Seite 226 - Required cables

Powering up the system and initial loading Page 301 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigur

Seite 227

Page 302 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007Preparing to power up – ACFollow Procedure 48 to pr

Seite 228 - FIJI card cabling

Powering up the system and initial loading Page 303 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProce

Seite 229 - FIJI card faceplate

Page 304 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20073 Set the blower unit switch for Column 0 to ON. On

Seite 230 - Figure 96

Powering up the system and initial loading Page 305 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning4 For

Seite 231

Page 306 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007Preparing to power up – DCProcedure 53Preparing to

Seite 232 - Shelf 0 fiber optic ring

Powering up the system and initial loading Page 307 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProce

Seite 233 - Shelf 1 fiber optic ring

Page 308 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20078 Make sure the green lights in all the module powe

Seite 234 - FIJI to FIJI cabling

Powering up the system and initial loading Page 309 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProce

Seite 235

Page 31 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning36IntroductionContentsThis section contains informa

Seite 236 - FIJI FIJI

Page 310 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20075 The system attempts to validate and format the FM

Seite 237

Powering up the system and initial loading Page 311 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningThe F

Seite 238 - Figure 101

Page 312 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007Low boundary = 0x137fc1High boundary = 0x1e8bdf>

Seite 239 - Network-to-network cabling

Powering up the system and initial loading Page 313 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningLabel

Seite 240 - Network module connections

Page 314 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007Mounting msdos fs /d on /dev/hda3...fdiskDevCreate(

Seite 241

Powering up the system and initial loading Page 315 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning6 The

Seite 242 - Figure 103

Page 316 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007At this point, either replace the RMD or quit the i

Seite 243

Powering up the system and initial loading Page 317 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning7 Sel

Seite 244 - NT8D99AB cable

Page 318 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20079 If the keycode matches, enter <CR> to conti

Seite 245 - (factory installed)

Powering up the system and initial loading Page 319 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning10 Se

Seite 246 - Figure 106

Page 32 of 456 IntroductionNN43021-310 Standard 02.01 December 2007Whenever possible, install external power equipment before the system installation

Seite 247 - NTND14 to 3PE cables

Page 320 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 200712 The system displays the release of the software

Seite 248

Powering up the system and initial loading Page 321 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning13 Ch

Seite 249 - Figure 108

Page 322 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 200714 The Installation Status Summary appears.

Seite 250 - Figure 109

Powering up the system and initial loading Page 323 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning15 En

Seite 251

Page 324 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 200716 The PSDL files menu appears. Enter the appropria

Seite 252

Powering up the system and initial loading Page 325 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning18 Th

Seite 253

Page 326 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 200719 Continue with database installation.Communicatio

Seite 254

Powering up the system and initial loading Page 327 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningThe i

Seite 255 - Figure 110

Page 328 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 200720 Upon returning to the main install menu, enter q

Seite 256

Powering up the system and initial loading Page 329 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning21 Th

Seite 257

Introduction Page 33 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningSummary of procedures1 Prepare equip

Seite 258 - 553-5289

Page 330 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 2007At this point the system should reload and initiali

Seite 259 - Figure 112

Powering up the system and initial loading Page 331 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioninga. Pe

Seite 260 - Figure 113

Page 332 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20077 Test the clocks:a. Verify that the clock controll

Seite 261 - Cabling lines and trunks

Powering up the system and initial loading Page 333 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProce

Seite 262 - 553-5391

Page 334 of 456 Powering up the system and initial loadingNN43021-310 Standard 02.01 December 20076 Clear the display and minor alarms on both Cores:

Seite 263 - Network Voltages (TNV)

Page 335 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning342Performing acceptance testsContentsThis section

Seite 264

Page 336 of 456 Performing acceptance testsNN43021-310 Standard 02.01 December 2007See Software Input/Output: Administration (NN43001-611) for a deta

Seite 265 - NT8D37 IPE Module I/O panels

Performing acceptance tests Page 337 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning4 Set the power supp

Seite 266 - Connecting lines and trunks

Page 338 of 456 Performing acceptance testsNN43021-310 Standard 02.01 December 20073 Use a screwdriver to loosen the retaining screws at the front of

Seite 267

Performing acceptance tests Page 339 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 117Blower uni

Seite 268

Page 34 of 456 IntroductionNN43021-310 Standard 02.01 December 200711 Connect a system terminal (or modem); go to “Connecting a system terminal or mo

Seite 269

Page 340 of 456 Performing acceptance testsNN43021-310 Standard 02.01 December 2007On the LCD displays on the Cards:• Following the “Selftest Complet

Seite 270

Performing acceptance tests Page 341 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning%*!&()<>=:

Seite 271

Page 342 of 456 Performing acceptance testsNN43021-310 Standard 02.01 December 20077 Set the line transfer switch on the PFTU to NORMAL, and test the

Seite 272

Page 343 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning362Installing earthquake bracingContentsThis secti

Seite 273

Page 344 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007Universal equipment modules (UEM) are designed to withstand most

Seite 274

Installing earthquake bracing Page 345 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningSelecting the kitT

Seite 275

Page 346 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007Next, each column must also be secured to the floor. This is acc

Seite 276

Installing earthquake bracing Page 347 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning— Flat washer, int

Seite 277

Page 348 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007Procedure 64Drilling concrete floors1 Using the equipment room f

Seite 278

Installing earthquake bracing Page 349 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling Kit A a

Seite 279

Introduction Page 35 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTable 2List of tasks in subsectionsT

Seite 280

Page 350 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007Figure 118Mounting plate installationEnd of ProcedurePedestalAnc

Seite 281

Installing earthquake bracing Page 351 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 66Instal

Seite 282

Page 352 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007Procedure 67Installing earthquake rods1 Remove the top cap on ea

Seite 283

Installing earthquake bracing Page 353 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 120Top cap

Seite 284

Page 354 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 20073 Install bracing rods:• Position each rod in one of the vertica

Seite 285

Installing earthquake bracing Page 355 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 121Installi

Seite 286

Page 356 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 20076 For a multiple-column system, install NT8D49AA Spacer Kits bet

Seite 287

Installing earthquake bracing Page 357 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 123Adding s

Seite 288

Page 358 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 20073 Loosely install the pedestal mounting hardware (1/2 in. bolts,

Seite 289

Installing earthquake bracing Page 359 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningNT8D64BF Floor Mou

Seite 290

Page 36 of 456 IntroductionNN43021-310 Standard 02.01 December 2007

Seite 291

Page 360 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 20075 Abandon the hole if you should hit a reinforcing bar or the ho

Seite 292

Installing earthquake bracing Page 361 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 124Pedestal

Seite 293

Page 362 of 456 Installing earthquake bracingNN43021-310 Standard 02.01 December 2007

Seite 294

Page 363 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning382Adding a module to a columnContentsThis section

Seite 295

Page 364 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007A module can be added to a column in one of three positions. A spe

Seite 296

Adding a module to a column Page 365 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 70Adding a

Seite 297

Page 366 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007Figure 125NT7D09CA Pedestal – module power and system monitor conn

Seite 298

Adding a module to a column Page 367 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 126Module mou

Seite 299 - Powering up the system and

Page 368 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 20075 Connect the power and system monitor cables in the module:a. Con

Seite 300

Adding a module to a column Page 369 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 127Module-to-

Seite 301 - Security Device

Page 37 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning64Preparing for installationContentsThis section co

Seite 302 - Preparing to power up – AC

Page 370 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007Adding a module between two other modulesIf conduit or other cabli

Seite 303 - Turning AC power ON

Adding a module to a column Page 371 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning3 Remove the module

Seite 304

Page 372 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 20074 Position and secure modules:a. Locate the positioning guides on

Seite 305

Adding a module to a column Page 373 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning5 Connect the power

Seite 306 - Turning DC power ON

Page 374 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007Adding a module to the top of a columnIn a DC-powered system, powe

Seite 307 - IMPORTANT!

Adding a module to a column Page 375 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning3 Disconnect power c

Seite 308 - Installing software

Page 376 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007Phillips head screwdriver and turn the fasteners 1/4-turn to relea

Seite 309

Adding a module to a column Page 377 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 133Top cap as

Seite 310

Page 378 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 20075 Position and secure the module being added:a. Locate the positio

Seite 311

Adding a module to a column Page 379 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 135Module mou

Seite 312

Page 38 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Before system equipment is delivered to the installation site, you m

Seite 313

Page 380 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 2007Figure 136Module-to-module power and system monitor connectionsI/O

Seite 314

Adding a module to a column Page 381 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning7 Install the perfor

Seite 315

Page 382 of 456 Adding a module to a columnNN43021-310 Standard 02.01 December 20079 Connect the orange power connector to the module power harness.

Seite 316

Page 383 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning448Installing a Signaling ServerContentsThis secti

Seite 317

Page 384 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007IntroductionThis chapter contains general instructions to instal

Seite 318

Installing a Signaling Server Page 385 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioningrack mounting, as

Seite 319

Page 386 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Table 64Readiness checklist (Part 1 of 2)Have you:Read all safet

Seite 320

Installing a Signaling Server Page 387 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling the CP

Seite 321

Page 388 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007This section contains general instructions for installing the CP

Seite 322

Installing a Signaling Server Page 389 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningConnectionsConnect

Seite 323

Preparing for installation Page 39 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning• A System Monitor che

Seite 324

Page 390 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007CS 1000M system respectively. It also contains instructions for

Seite 325

Installing a Signaling Server Page 391 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 139Faceplat

Seite 326

Page 392 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Procedure 73Connecting a Nortel CP PM Signaling ServerNote: Refe

Seite 327

Installing a Signaling Server Page 393 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning5 Set the COM port

Seite 328

Page 394 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007— Insert the end of a longer RJ-45 CAT5 Ethernet cable (not supp

Seite 329

Installing a Signaling Server Page 395 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 75Connec

Seite 330

Page 396 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 140IBM X306m Signaling Server (rear view)Note: Refer to F

Seite 331

Installing a Signaling Server Page 397 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning5 Set the baud rat

Seite 332 - Switch call processing

Page 398 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Procedure 77Connecting an HP DL320-G4 Signaling Server1 Connect

Seite 333

Installing a Signaling Server Page 399 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling the Sig

Seite 334

Page 4 of 456 ContentsNN43021-310 Standard 02.01 December 2007Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31Contents

Seite 335 - Performing acceptance tests

Page 40 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007• A red LED in the front of the cap’s exhaust grill that lights if t

Seite 336

Page 400 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Installing the softwareTo install software and enter basic syste

Seite 337

Installing a Signaling Server Page 401 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 142Nortel C

Seite 338

Page 402 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 143VxWorks system banner When the Install Tool banner app

Seite 339 - Testing the sysload

Installing a Signaling Server Page 403 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 144Install

Seite 340

Page 404 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007The system verifies the file systems. • If the hard drive of the

Seite 341 - Testing the PFTU

Installing a Signaling Server Page 405 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 146Date and

Seite 342

Page 406 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 147System SummaryCS 1000 Signaling Server Software Instal

Seite 343 - Installing earthquake bracing

Installing a Signaling Server Page 407 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 148Install

Seite 344 - Installing seismic bracing

Page 408 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007The Dependency Lists installation screen appears (Figure 149).Fi

Seite 345 - Selecting the kit

Installing a Signaling Server Page 409 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 150Installa

Seite 346

Preparing for installation Page 41 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 2Example of Lar

Seite 347 - Drilling concrete floors

Page 410 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 151Installation outputFigure 152Software installation suc

Seite 348

Installing a Signaling Server Page 411 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 153IP Phone

Seite 349

Page 412 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 155Restore IP configuration8 Do one of the following:• If

Seite 350 - Mounting plate installation

Installing a Signaling Server Page 413 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 156IP telep

Seite 351 - Installing earthquake rods

Page 414 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 157Signaling Server role selection10 Configure the Signal

Seite 352 - Air exhaust grill

Installing a Signaling Server Page 415 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 158Follower

Seite 353 - 553-3038

Page 416 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 200711 Configure the application configuration for this Signaling Se

Seite 354

Installing a Signaling Server Page 417 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 161Network

Seite 355 - 553-3063

Page 418 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 162NRS type — co-resident Signaling ServerFigure 163NRS t

Seite 356 - 553-5641

Installing a Signaling Server Page 419 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningDepending on wheth

Seite 357 - — 24 mm (15/16 in.) for Kit B

Page 42 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 3UEMs identified by function Card cageInside each UEM is a me

Seite 358

Page 420 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 165Stand-alone Signaling Server configuration14 Enter the

Seite 359

Installing a Signaling Server Page 421 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTLAN subnet parame

Seite 360

Page 422 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007— Enter the address of the Primary NRS (optional).— If you did e

Seite 361 - 553-7473

Installing a Signaling Server Page 423 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning16 Enter <CR>

Seite 362

Page 424 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 169Installation Status Summary18 Press <CR> to exit

Seite 363 - Adding a module to a column

Installing a Signaling Server Page 425 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 170Install

Seite 364

Page 426 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 200719 Remove the Signaling Server Software CD or the Signaling Serv

Seite 365

Installing a Signaling Server Page 427 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning– Primary and Alte

Seite 366 - (NT8D46CB cable)

Page 428 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 20072 Press <CR> to continue with the configuration. The Resto

Seite 367 - 553-3057

Installing a Signaling Server Page 429 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning4 Enter the locati

Seite 368

Preparing for installation Page 43 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningCore/Net moduleLarge S

Seite 369 - Figure 127

Page 430 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 176Follower Signaling Server configuration7 If there is n

Seite 370 - DANGER OF ELECTRIC SHOCK

Installing a Signaling Server Page 431 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning8 Configure the ap

Seite 371

Page 432 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 178Standalone Signaling Server - NRSFigure 179NRS type —

Seite 372 - Opening for

Installing a Signaling Server Page 433 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningDepending on wheth

Seite 373

Page 434 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 182Stand-alone Signaling Server configuration10 Enter the

Seite 374

Installing a Signaling Server Page 435 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 183IP Telep

Seite 375 - Push here

Page 436 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Depending on whether the Signaling Server is configured as Prima

Seite 376 - 1/4 turn fasteners

Installing a Signaling Server Page 437 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning— If you did enter

Seite 377 - Top cap assembly

Page 438 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 200712 Press <CR> or enter y to confirm all parameters entered

Seite 378

Installing a Signaling Server Page 439 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 187Install

Seite 379

Page 44 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 4NT4N41 Core/Net shelf fanout panel (backplane) j3 slot 9

Seite 380 - Figure 136

Page 440 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 188Installation Tool quit confirmation14 Enter q to close

Seite 381 - Key on cable

Installing a Signaling Server Page 441 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningProcedure 80Adding

Seite 382

Page 442 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 189Node Configuration web page5 Click Edit next to the no

Seite 383 - Installing a Signaling Server

Installing a Signaling Server Page 443 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 190Edit web

Seite 384

Page 444 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Figure 191Signaling Server properties template7 Enter the inform

Seite 385 - Readiness checklist

Installing a Signaling Server Page 445 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning8 Click Save and T

Seite 386

Page 446 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007Procedure 81Logging in to the Signaling ServerBefore you begin,

Seite 387

Installing a Signaling Server Page 447 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningVerifying a succes

Seite 388

Page 448 of 456 Installing a Signaling ServerNN43021-310 Standard 02.01 December 2007

Seite 389 - Connections

Page 449 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningIndexNumerics500/2500-type telephones, 149AA036791

Seite 390

Preparing for installation Page 45 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningSystem optionsThe proc

Seite 391 - Figure 139

Page 450 of 456 Index NN43021-310 Standard 02.01 December 2007Ccables and cablingfourth modules, 68lines and trunks, 261module additions, 368, 369, 37

Seite 392

Index Page 451 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFfield wiring kits and terminalsPDU connec

Seite 393

Page 452 of 456 Index NN43021-310 Standard 02.01 December 2007Measurement, 66Meridian 1 Option 61C, 45Meridian 1 Option 81C, 45Meridian 1 systemsupgra

Seite 394

Index Page 453 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningNT8D37 IPE Modulesbackplane slots, 138cabl

Seite 395

Page 454 of 456 Index NN43021-310 Standard 02.01 December 2007positioningearthquake bracing, 357equipment, 71positioning guidesfourth modules, 66modul

Seite 396

Index Page 455 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningTtelephones, PFTU connections, 149testsblo

Seite 397

Page 456 of 456 Index NN43021-310 Standard 02.01 December 2007

Seite 399 - Before you begin

Family Product Manual Contacts Copyright FCC notice Trademarks Document number Product release Document release Date PublishNortel Communication Serve

Seite 400 - Installing the software

Page 46 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 5Meridian 1 PBX 61C stacked configuration Figure 6Meridian 1

Seite 401

Preparing for installation Page 47 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningMeridian 1 PBX 81C and

Seite 402

Page 48 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 8Three-tier multi-group system CP PIVA Call Processor Pentium

Seite 403

Preparing for installation Page 49 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningNew system typesThere

Seite 404

Contents Page 5 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling overhead cable tray kits .. .

Seite 405

Page 50 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 9CP PIV call processor card (side)512 MBytes DDR memoryFixedM

Seite 406

Preparing for installation Page 51 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 10CP PIV call p

Seite 407

Page 52 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Signaling ServerCS 1000M systems use a Signaling Server. The Signali

Seite 408

Preparing for installation Page 53 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 11CS 1000M Larg

Seite 409

Page 54 of 456 Preparing for installationNN43021-310 Standard 02.01 December 20076 Sending and receiving cables must be of equal lengths and as short

Seite 410

Preparing for installation Page 55 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 12Cable routing

Seite 411

Page 56 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Since all faceplate to I/O panel cables are the same length and card

Seite 412

Preparing for installation Page 57 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning2 Vertically on the si

Seite 413

Page 58 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 15180° cable connectorEquipment handling precautionsTo avoid

Seite 414

Preparing for installation Page 59 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningWorking with power sup

Seite 415

Page 6 of 456 ContentsNN43021-310 Standard 02.01 December 2007Connecting a system terminal or modem . . . . . . 171Contents . . . . . . . . . . .

Seite 416

Page 60 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 16Static discharge pointsWrist strap connection pointBare met

Seite 417

Preparing for installation Page 61 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningDenAn regulatory notic

Seite 418

Page 62 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Preparing the equipment for installationUse the equipment room floor

Seite 419

Preparing for installation Page 63 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioninga. With a flat blade s

Seite 420

Page 64 of 456 Preparing for installationNN43021-310 Standard 02.01 December 2007Figure 18Removing the pedestal grill4 Make sure all of the items on

Seite 421

Page 65 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning70Placing the fourth module on a columnContentsThis

Seite 422

Page 66 of 456 Placing the fourth module on a columnNN43021-310 Standard 02.01 December 2007Procedure 2Placing the fourth module on a column1 Positio

Seite 423

Placing the fourth module on a column Page 67 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 19Mo

Seite 424

Page 68 of 456 Placing the fourth module on a columnNN43021-310 Standard 02.01 December 2007Figure 20Module mounting bolts2 Connect the module-to-mod

Seite 425

Placing the fourth module on a column Page 69 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 21Po

Seite 426

Contents Page 7 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningCabling Common Equipment in aMulti Group

Seite 427 - Commissioning (NN43001-313)

Page 70 of 456 Placing the fourth module on a columnNN43021-310 Standard 02.01 December 2007

Seite 428

Page 71 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning76Positioning and leveling equipmentContentsThis se

Seite 429

Page 72 of 456 Positioning and leveling equipmentNN43021-310 Standard 02.01 December 2007c. Position a level across the top module cover on the front

Seite 430

Positioning and leveling equipment Page 73 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 22Posit

Seite 431

Page 74 of 456 Positioning and leveling equipmentNN43021-310 Standard 02.01 December 2007Figure 23Spacer positioningSpacerScrew Stand-off553-A0130Rea

Seite 432 - (NN43001-313)

Positioning and leveling equipment Page 75 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 24Colum

Seite 433

Page 76 of 456 Positioning and leveling equipmentNN43021-310 Standard 02.01 December 2007

Seite 434

Page 77 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning88Installing AC powerContentsThis section contains

Seite 435

Page 78 of 456 Installing AC powerNN43021-310 Standard 02.01 December 2007Systems that use reserve power plug into the UPS, which in turn plugs into

Seite 436

Installing AC power Page 79 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningMultiple-column systems use a

Seite 437

Page 8 of 456 ContentsNN43021-310 Standard 02.01 December 2007Cabling lines and trunks . . . . . . . . . . . . . . . . . . . . 261Contents . . . .

Seite 438

Page 80 of 456 Installing AC powerNN43021-310 Standard 02.01 December 2007Figure 26Multiple column – ground and logic return distribution AC inputSer

Seite 439

Installing AC power Page 81 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 27Multiple column, mul

Seite 440

Page 82 of 456 Installing AC powerNN43021-310 Standard 02.01 December 2007Installing safety ground/protective earth and logic return wiringFollow Pro

Seite 441

Installing AC power Page 83 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 28PDU ground lug locat

Seite 442

Page 84 of 456 Installing AC powerNN43021-310 Standard 02.01 December 20075 Place a warning tag on the connection at the ground source. The warning t

Seite 443

Installing AC power Page 85 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling UPS ground cabling

Seite 444

Page 86 of 456 Installing AC powerNN43021-310 Standard 02.01 December 2007Procedure 5Installing the UPS ground cabling1 Make sure the safety ground/p

Seite 445

Installing AC power Page 87 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 32UPS grounding diagra

Seite 446

Page 88 of 456 Installing AC powerNN43021-310 Standard 02.01 December 2007

Seite 447

Page 89 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning92Installing overhead cable tray kitsContentsThis s

Seite 448

Contents Page 9 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningInstalling seismic bracing . . . . . . .

Seite 449 - Numerics

Page 90 of 456 Installing overhead cable tray kitsNN43021-310 Standard 02.01 December 2007Procedure 6Installing the overhead cable tray kits1 Remove

Seite 450

Installing overhead cable tray kits Page 91 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningFigure 34Over

Seite 451

Page 92 of 456 Installing overhead cable tray kitsNN43021-310 Standard 02.01 December 2007

Seite 452

Page 93 of 456Communication Server 1000M and Meridian 1 Large System Installation and Commissioning132Installing DC powerContentsThis section contains

Seite 453

Page 94 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Note: The procedures in this chapter apply to the global power distribution

Seite 454

Installing DC power Page 95 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningBoth Large and Small Candeo s

Seite 455

Page 96 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007Note 2: The Large Candeo system generally requires one input receptacle fo

Seite 456 - Page 456 of 456 Index

Installing DC power Page 97 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningLarge Candeo modulesThe Cande

Seite 457

Page 98 of 456 Installing DC powerNN43021-310 Standard 02.01 December 2007System Manager ModuleThe System Manager is the main control element of the

Seite 458 - Communication Server 1000M

Installing DC power Page 99 of 456Communication Server 1000M and Meridian 1 Large System Installation and CommissioningDistribution Module features