Nortel-networks 1000M Bedienungsanleitung Seite 73

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 474
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 72
Readiness checklist 73
made sure your area meets all environmental requirements?
checked for all power requirements?
checked for correct grounding facilities?
developed an equipment layout plan for the system?
completed the card slot assignment plan?
assembled all the tools required to continue with the installation?
If you have completed all of the above items, you are ready to proceed
with the installation of the system.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310 01.04 Standard
Release 5.0 13 May 2008
Copyright © 2008, Nortel Networks
.
Seitenansicht 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 473 474

Kommentare zu diesen Handbüchern

Keine Kommentare