230 MG 1000B platform hardware installation
Preparing for rack-mounting
Procedure 14
Preparing the Signaling Server for rack-mounting
Step Action
The Front Mount Bracket assembly is not intended for use as a slide rail
system. The Signaling Server must be firmly attached to the rack.
1
Make sure the Signaling Ser ver is not plugged into an electrical
outlet.
2
Align the end of the rail (A in Figure 75 "Signaling Server brackets
(two of each)" (page 229)) with the flange (B in Figure 76 "Signaling
Server support bracket" (page 230)) toward the back of the Signaling
Server. See Figure 76 "Signaling Server support bracket" (page
230).
Figure 76
Signaling Server support bracket
3
Align the screw holes in the rack-mount rail with the mating holes in
the side of the Signaling Server. Use three screws (C) on each side.
Hand-tighten the screws to prevent cross-threading then use a
Phillips screwdriver to secure them.
4
Attach the bezel door to the faceplate of the Signaling Server, as
shown in Figure 77 "Left hinge mount" (page 231) and Figure 78
"Right hinge mount" (page 231).
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
Copyright © 2007, Nortel Networks
.
Kommentare zu diesen Handbüchern