Nortel Networks 703t Bedienungsanleitung Seite 46

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 72
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 45
Preinstallation requirements Standard 1.04
46 CallPilot
1 Ensure that the server is laying on its side, supported to give the server
bottom four to five inches clearance above the work surface.
2 Attach the feet as shown in the preceding diagram.
Use four screws to attach each foot to the chassis. The holes in the feet
line up with only one set of holes in the chassis, as follows:
front foot: The middle hole is towards the front of the chassis.
back foot: The middle hole is towards the back of the chassis.
3 Place the server on its feet.
What’s next?
Continue with the hardware installation. For more information, see
“Installation checklist” on page 34.
Seitenansicht 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 71 72

Kommentare zu diesen Handbüchern

Keine Kommentare