Nortel-networks 1000M Bedienungsanleitung Seite 155

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 474
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 154
Connecting other battery backup systems 155
Figure 70
Power cord routing
Connecting other battery backup systems
This procedure describes how to install and connect customer-supplied
battery backup systems.
Charging capabilities of the Cabinet system are described in Communication
Server 1000M and Meridian 1 Small System Planning and Engineering
(NN43011-220). The system external ground must be installed before
installing the battery backup.
Procedure 18
Installing other battery systems
Step Action
1
Unpack the battery box and place it according to the equipment
layout plan.
2
Remove its cover.
3
Set the switch on the battery box to OFF.
Nortel Communication Server 1000
Communication Server 1000M and Meridian 1 Small System Installation and Commissioning
NN43011-310 01.04 Standard
Release 5.0 13 May 2008
Copyright © 2008, Nortel Networks
.
Seitenansicht 154
1 2 ... 150 151 152 153 154 155 156 157 158 159 160 ... 473 474

Kommentare zu diesen Handbüchern

Keine Kommentare